In October 2026, in addition to regular maintenance, there will be two weekend closures of the Koning Willem-Alexander Tunnel.
During one weekend closure, the A2 tunnel tubes will be closed, and during the other weekend the N2 tunnel tubes.

Regular tunnel maintenance of the Koning Willem-Alexander tunnel

  • The A2 tunnel is closed in both directions but traffic can continue via the N2 tunnel tubes.

  • The N2 tunnel is closed in both directions. The following entry slip roads and exits to/from the N2 tunnel are also closed:

    • Exit 53 from the direction of the tunnel towards Berg en Terblijt and Maastricht Centrum-Noord
    • Exit 54 from the direction of the tunnel towards Cadier en Keer, Hasselt and Maastricht Centrum-Zuid
    • From the direction of John F. Kennedysingel towards Centrum Noord / Berg and Terblijt (exit 53) or A2/A79
    • From the direction of Viaductweg towards N2 in the direction of Centrum Zuid / Cadier and Keer (exit 54) and A2

    Through traffic on the A2 towards Liège or Eindhoven can use the A2 tunnel. Local traffic will be diverted:

    • From the direction of Viaductweg/Noorderbrug towards Liège: Terblijterweg – Vijverdalseweg – Akersteenweg – driveway from John F. Kennedysingel towards Liège.
    • From the north (A2 Eindhoven /A79 Heerlen) towards Maastricht-Centrum Zuid or Cadier en Keer: The A2 tunnel, exit 55 Randwyck, make a U-turn, driveway 55 Randwyck, exit 54 Maastricht-Centrum Zuid/Cadier en Keer.
    • From the direction of Liège naar Maastricht-Centrum Noord of Berg en Terblijt: A2, A79, exit 1 Bunde, Nieuwe Limmelderweg, driveway to N2 towards the south (Maastricht/Liège), exit 53 Maastricht-Centrum Noord/Berg en Terblijt.
    • From the direction of John F Kennedysingel towards the north (A2 Eindhoven/A79 Heerlen): Akersteenweg, Vijverdalseweg, Terblijterweg, A2. 

Additional weekend closures of the Koning Willem-Alexander Tunnel

  • The A2 tunnel is closed in both directions but traffic can continue via the N2 tunnel tubes.

  • The N2 tunnel is closed in both directions. The following entry slip roads and exits to/from the N2 tunnel are also closed:

    • Exit 53 from the direction of the tunnel towards Berg en Terblijt and Maastricht Centrum-Noord
    • Exit 54 from the direction of the tunnel towards Cadier en Keer, Hasselt and Maastricht Centrum-Zuid
    • From the direction of John F. Kennedysingel towards Centrum Noord / Berg and Terblijt (exit 53) or A2/A79
    • From the direction of Viaductweg towards N2 in the direction of Centrum Zuid / Cadier and Keer (exit 54) and A2

    Through traffic on the A2 towards Liège or Eindhoven can use the A2 tunnel. Local traffic will be diverted:

    • From the direction of Viaductweg/Noorderbrug towards Liège: Terblijterweg – Vijverdalseweg – Akersteenweg – driveway from John F. Kennedysingel towards Liège.
    • From the north (A2 Eindhoven /A79 Heerlen) towards Maastricht-Centrum Zuid or Cadier en Keer: The A2 tunnel, exit 55 Randwyck, make a U-turn, driveway 55 Randwyck, exit 54 Maastricht-Centrum Zuid/Cadier en Keer.
    • From the direction of Liège naar Maastricht-Centrum Noord of Berg en Terblijt: A2, A79, exit 1 Bunde, Nieuwe Limmelderweg, driveway to N2 towards the south (Maastricht/Liège), exit 53 Maastricht-Centrum Noord/Berg en Terblijt.
    • From the direction of John F Kennedysingel towards the north (A2 Eindhoven/A79 Heerlen): Akersteenweg, Vijverdalseweg, Terblijterweg, A2. 

Overview constructions works

Planned closures